CORENET X Mandatory October 2026

Urban Redevelopment Authority Parameters

Singapore's national urban planning authority

37
Parameters
URA
Agency Requirements

About URA Requirements

URA is Singapore's national urban planning authority, responsible for long-term strategic plans (Concept Plan), statutory plans (Master Plan), and development control.[1] URA evaluates applications for compliance with land use zoning, plot ratio, building height, setbacks, and urban design guidelines.

URA's 37 IFC-SG parameters capture planning compliance: GFA calculations, building height, setback dimensions, use class designations, and storey heights.[2] For developments in Urban Design Areas, additional parameters for building form, landscape provisions, and public accessibility apply.

Common pain points include Written Permission (WP) lapsing (only valid 2 years), GFA calculation disputes over exemptions (voids, balconies, M&E rooms), and Urban Design Checklist compliance for developments in strategic areas.[3] Landscape Replacement Area clearance is required before BCA issues TOP/CSC.

Key Compliance Areas

Land Use & Development Control

  • Planning Permission (Written Permission) for all building projects
  • GFA compliance with approved plot ratio and zoning
  • Building height controls and technical height limits
  • Building setbacks from road reserve and boundaries
  • Site coverage limitations

Master Plan & Zoning

  • Land use alignment with Master Plan zoning
  • Plot ratio intensity compliance
  • Special area requirements (Marina Bay, Orchard Road)
  • Conservation area guidelines for gazetted buildings

Urban Design & Public Realm

  • Urban Design (UD) Checklist for UD Areas
  • Landscape Replacement Areas (GnPR, LUSH programs)
  • Pedestrian networks and publicly accessible spaces
  • Streetscape and building facade guidelines

Common URA Compliance Challenges

Written Permission Lapsing

WP is valid only 2 years from grant date. Extension application must be submitted before expiration—lapsed WP requires fresh submission. Projects proceeding with lapsed approvals discover non-compliance only at BCA BP submission stage. Master Plan changes during lapsed period may require redesign.

GFA Calculation Disputes

Ambiguity over which spaces qualify for GFA exemption (voids, balconies, planter areas). Architects designing with assumed exemptions discover non-compliance at URA review, forcing GFA reduction redesign. M&E room sizing affects both GFA and building height compliance.

Urban Design Checklist Compliance

UD Checklist mandatory for first submission in UD Areas, but architects unfamiliar with which sites fall under UD requirements. Critical items in Sections II.e and II.f must be compliant or justified. Photomontages and urban design analysis increase preparation time.

Landscape Replacement Area Clearance

Developments in Strategic Areas require URA clearance of completed LRA before BCA issues TOP/CSC. Post-construction verification that tree species, planter depths, and green roof installations match approved plans. Coordination between landscape consultant, architect, and QP often breaks down.

URA Parameter Database

Search and explore all 37 parameters required for Urban Redevelopment Authority submissions.

Loading parameter database...

Frequently Asked Questions about CORENET X for URA

Validate URA Parameters Inside Revit

Senibina-Gateway brings CORENET X compliance directly into your BIM workflow. Validate URA parameters, check requirements in real-time, and submit with confidence - all without leaving Revit.